Neville Bonner Primary Outdoor Space
LOCATION
Bonner, ACT
CLIENT
ACT Property Group
COMPLETION DATE
October 2020
MBS FM was appointed to complete the construction of a pergola and landscape project at Neville Bonner Primary School. MBS FM implemented appropriate measures to mitigate any disruptions to the school’s daily operations with a physical barrier maintained around the construction site to minimise all possible interference with students and staff of the school.
This project was delivered with minimal delay, overcoming significant inclement weather conditions during the construction. The architecturally designed project was delivered without exception and to all stakeholders satisfaction.