Harrison School Walkway

LOCATION
Harrison, Canberra

CLIENT
Harrison School

COMPLETION DATE
June 2020

MBS FM was appointed to complete the construction of a new covered walkway at Harrison School in Canberra. 

After identifying some structural design flaws during the delivery of this project, we worked collaboratively with the client to alter the design accordingly to achieve the desired result while maintaining the structural integrity of the new walkway. 

The new walkway has been built to match the existing school structures creating a seamless addition to the walkways of the school. 

Previous
Previous

Burgmann College Maintenance Contract

Next
Next

Mount Stromlo High School Bathrooms